
Tile Installation
Ceramic and porcelain for floors and wet walls, laid out so the cuts, the slope, and the grout are decided before the mortar starts.
Completed projects include a 1-year warranty that starts at project completion.
Design inspiration, not a completed JRF project
Ceramic, porcelain, and the pieces that finish the edge
Tile is a clay or porcelain body, glazed or through-color, set in mortar on a prepared substrate. The tile is the part you see. The substrate and the joints decide whether a wet room lasts.
Wet rooms, entries, and floors that stay put
Tile is the surface that can be cleaned hard, as long as the assembly under it was built for water or for the traffic.
Layout first, then mortar, then grout
A joint that is out of square at the tub is still out of square at the ceiling. Tile does not forgive a bad start.
The grout is the maintenance
Glazed porcelain is the easy part. The joints, the stone if you chose stone, and the movement under the floor are the rest.
Before a single box is ordered
Layout and substrate take longer to talk through than the color.
Do you tile showers, or only floors?+
Both. A shower is waterproofing, slope, the curb or the linear drain, the niche, and then the tile. A floor is flatness, movement joints, and grout. They are different assemblies.
What has to be true before large-format tile goes down?+
The floor has to be flat within the tolerance of that tile. A typical wood subfloor in an older Atlanta house is not that flat until someone makes it flat. Skipping that step is how you feel every edge with your feet.
Can you match tile from a 1990s bath?+
Rarely the exact run. We can often find a field that sits quietly next to what is left, or we redo the visible area so you are not looking at a patch. We will tell you which one it is before demolition.
Who handles the glass and the plumbing?+
JRF coordinates the tile and the finish surfaces. Plumbing moves and shower glass are called out in the scope so they are scheduled. If those trades are yours, that has to be decided before the layout is set.
Show us the wet room or the floor.
Tile goes well when the substrate and the layout are settled before the material arrives.
Completed projects include a 1-year warranty that starts at project completion.
