Call nowFree estimate
Flooring services

Flooring

Flooring selected for the room you have: the subfloor, the water, the traffic, and the finish you want to live with.

Completed projects include a 1-year warranty that starts at project completion.

Materials

The floors we actually install

JRF installs the hard surfaces and the soft floors that show up in Southeast houses and in light commercial rooms. The right one depends on the subfloor, the water, and how the room is used.

HardwoodSolid and engineered wood for rooms that can hold a stable indoor climate. Species, finish, and acclimation are covered on the hardwood page.
TileCeramic and porcelain for floors, showers, and backsplashes. Large-format pieces need a flat substrate, and a shower needs waterproofing behind the tile.
CarpetResidential carpet with a separate pad, for bedrooms, stairs, and rooms where a softer, quieter floor is the point.
Luxury vinyl plankA vinyl core with a wear layer on top. It is the usual conversation for basements, slabs, and busy family rooms, once the surface under it is dry and flat.
LaminateA fiberboard core with a photographic wear film. A practical floor for bedrooms and other dry rooms. It is a poor choice where water collects.
Where it belongs

Match the floor to the room

A sample board cannot tell you whether the slab is damp or the hallway will land on a sliver of a plank. The room decides.

Wet and below-grade roomsBasements, laundry rooms, and full baths need a product that can live with moisture. Tile and a vinyl plank rated for that use are the usual options. Hardwood and laminate are not.
Front roomsLiving rooms and dining rooms can take hardwood, a better laminate, or a wood-look vinyl. Traffic, afternoon sun, and whether the floor continues through a kitchen all matter.
Bedrooms and stairsCarpet is still the quiet choice on stairs and in bedrooms. Hardwood is the other. The nosing and the landing belong in the same plan as the floor they meet.
WorkplacesOffices and small retail rooms need a floor that can be cleaned every night and patched if a piece fails. That is a different spec than a bedroom.
The work

Between the first visit and the last vacuum

Most of a flooring job is decided before the first box is opened. A typical scope is described on the what's included page. Your proposal is the scope for your address.

Visit and measureWe look at the existing floor, the transitions, and anything soft or high in the subfloor, then measure the rooms that are actually in the job.
PrepOld flooring comes out when it is part of the scope. The subfloor is flattened and cleaned so the new surface does not copy every lump underneath it.
InstallBoards, planks, tile, or carpet go in on the layout we agreed to, including the direction of the floor and the grout joint if there is one.
Trim and walkthroughShoe, reducers, and thresholds go on last. We walk the rooms with you before the job is called done.
Afterward

Living with a new floor

The install gets the floor in the house. The next ten years are mostly grit, water, and humidity.

Grit at the doorSand scratches wood, laminate, and vinyl wear layers. Mats at the outside doors, including the garage entry, do more than any cleaner.
WaterWipe spills. A wood or laminate floor should not be wet-mopped. A vinyl plank that is marketed as waterproof still should not sit in standing water.
FurnitureFelt pads on chairs. Lift a sofa instead of dragging it across a new floor.
HumidityGeorgia summers are humid. Solid wood moves when a house is closed up with the air off. Each material page says what that floor can tolerate.
Questions

Before the flooring visit

These are the questions that change the recommendation. The proposal is still where your rooms get a specific answer.

Do you install carpet as well as hard surfaces?+

Yes. Bedrooms, stairs, and other rooms that want a softer floor can be carpeted, including the pad and removal of the old carpet when that is in the scope.

Can one project use more than one material?+

Often it should. A tile bath, a wood living room, and carpeted bedrooms can meet cleanly if the transitions and the heights are planned together.

Which floor belongs in a kitchen?+

Kitchens get spills, bar stools, and a dishwasher that can leak. Tile and a vinyl plank rated for that use are the straightforward options. Wood can work in some kitchens when the product allows it and the sink run is treated honestly.

What should I have ready for the visit?+

Enough of the floor visible to walk it, a sense of which rooms are in the job, and any product you have already fallen for. Photos help if you write first.

Tell us which rooms are in the job.

A measured visit is more useful than dimensions copied from a listing.

Completed projects include a 1-year warranty that starts at project completion.

Request a free estimate